Please use this identifier to cite or link to this item: http://lib.kart.edu.ua/handle/123456789/14898
Full metadata record
DC FieldValueLanguage
dc.contributor.authorКалабухін, Юрій-
dc.contributor.authorМартинов, Ігор-
dc.contributor.authorТруфанова, Альона-
dc.contributor.authorМартинов, Станіслав-
dc.contributor.authorKalabukhin, Yuri-
dc.contributor.authorMartynov, Igor-
dc.contributor.authorTrufanova, Alyona-
dc.contributor.authorMartynov, Stanislav-
dc.date.accessioned2023-05-05T05:16:46Z-
dc.date.available2023-05-05T05:16:46Z-
dc.date.issued2022-
dc.identifier.citationКалабухін Ю. До питання визначення ефективності модернізації електропоїздів / Ю. Калабухін, І. Мартинов, А. Труфанова, С. Мартинов // Збірник наукових праць Державного університету інфраструктури та технологій. Серія : Транспортні системи і технології. - 2022. - Вип. 40. - С. 35-46.uk_UA
dc.identifier.issn2617-9040 (print)-
dc.identifier.urihttp://lib.kart.edu.ua/handle/123456789/14898-
dc.description.abstractUA: У статті викладено результати розробки методологічного підходу до визначення складових ефективності модернізації моторвагонного рухомого складу на прикладі використання буксових вузлів з підшипниками нового покоління. Проаналізовано чинники, що впливають на величину додаткових капітальних витрат на здійснення модернізації електропоїздів удосконаленими буксовими вузлами. Показано, що додаткові капітальні вкладення обумовлені витратами на науково-дослідницькі і дослідноконструкторські роботи, які пов’язані з модернізацією електропоїздів, а також витратами на придбання та обладнання електропоїзда буксовими вузлами нового покоління взамін базових.uk_UA
dc.description.abstractEN: The article presents the results of the development of a methodological approach to determining the components of the efficiency of the modernization of rolling stock using the example of the exploitation of bushing units with new generation bearings. Factors affecting the amount of additional capital costs for the modernization of electric trains with improved bushing units are analyzed. It is shown that additional capital investments arise due to the costs of research and development works, which are associated with the modernization of electric trains, as well as the costs of purchasing and equipping an electric train with new-generation bushing units instead of basic ones. It is proposed to adapt the calculation of the annual operating costs for the operation of the electric train to the conditions of the specific route served by it and to the existing system of maintaining the rolling stock in a technically sound condition. At the same time, the calculation of operational indicators of the use of the electric train on the route was performed.-
dc.publisherДержавний університет інфраструктури та технологійuk_UA
dc.relation.ispartofseriesТранспортні системи і технології;-
dc.subjectмоторвагонний рухомий складuk_UA
dc.subjectелектропоїздuk_UA
dc.subjectмодернізаціяuk_UA
dc.subjectремонтuk_UA
dc.subjectобслуговуванняuk_UA
dc.subjectефективністьuk_UA
dc.subjectексплуатаційні витратиuk_UA
dc.subjectзалишковий період експлуатаціїuk_UA
dc.subjectrolling stockuk_UA
dc.subjectelectric trainuk_UA
dc.subjectmodernizationuk_UA
dc.subjectrepairuk_UA
dc.subjectmaintenanceuk_UA
dc.subjectefficiencyuk_UA
dc.subjectoperating costsuk_UA
dc.subjectresidual period of operationuk_UA
dc.titleДо питання визначення ефективності модернізації електропоїздівuk_UA
dc.title.alternativeOn the question of determining the efficiency of the modernization of electric trainsuk_UA
dc.typeArticleuk_UA
Appears in Collections:2022

Files in This Item:
File Description SizeFormat 
Kalabukhin.pdf1.04 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.